Pinewood
Railway August 2015
The weather did not look
to good, rain and storms, but for those who attended the rain
cleared and the sun came out. Martin has replaced the bottom
section of his track after building works which required the
removal of the lower section. This had given him the opportunity
to replace some of the track bed and wooden walls along the
raised section around the loop section returning the trains up
to the tunnel and onwards up the garden. With the sun out the
numbers increased and the food and drinks that Elizabeth had
arranged went down with all and a junior member was well into
the running of his train he had bought along with his dad. His
dad had some first produced LGB trains and carriages which was
an interesting display for G Scale members to look at. The
chairman asked if he would be willing to bring these items along
to the Kent G Scale big show next year as it would be a good
display to have. It was a great day after a bad start we the
rain, but that is what the open day is about meeting members and
running trains. (written
by Jeff Fray)
|